Textile-Centre-Parnell-Commercial Build-Urry-Burgess Constructiom-UBC

Textile Centre

 

Textile Centre

Parnell, Auckland

 
 
 

Bath Street Parnell, Auckland

Bath Street Parnell, Auckland

 
 

The Textile Centre project in Parnell was delivered in multiple stages over 12-months, with all works carried out within a fully operational building. Careful planning and flexibility were key to keeping the building accessible and safe for tenants throughout.

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UB

 

Stage One

Stage One focused on creating a new internal connection between Faraday Street and Kenwyn Street, including excavation to form a central walkway and the construction of a new stairwell. Existing brickwork was retained and exposed, paired with new structural steel elements through the stair, balustrades, and detailing.

 

 

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 
 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UB

 

Stage Two shifted to the St Georges Bay Road entrance, upgrading the space with timber cladding, new finishes, and fire-rated treatments to improve both function and appearance.

Stage Two shifted to the St Georges Bay Road entrance, upgrading the space with timber cladding, new finishes, and fire-rated treatments to improve both function and appearance.

 

Stage Two

Stage Two shifted to the St Georges Bay Road entrance, upgrading the space with timber cladding, new finishes, and fire-rated treatments to improve both function and appearance.

 
 
 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 
 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 
 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

Stage Three

The final stage upgraded the Kenwyn Street entry from Ground to Level Four, including replica timber detailing, lighting, and fire service improvements to open and simplify the space.

Working within a live environment required strong coordination across trades, clear staging, and regular adjustment to the programme. The result is a practical upgrade that improves access and usability while respecting the building’s existing character.

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC-8612

 

Textile-Centre-Parnell-Commercial Build-Urry-Burgess Constructiom-UBC

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC-8586

Textile-Centre-Parnell-Commercial-Build-Urry-Burgess-Constructiom-UBC

 

Photographed by David Straight

Back

This is a unique website which will require a more modern browser to work!

Please upgrade today!

Share